- Permit details
- Permit number: RES-ELC-25-017710
Work category: Building / Residential / Electrical
Recorded status: Closed - Complete
- Original job description and scope
- - Build several piers
- Rebuild a section of front wall
- Modify some walls
- Framing repairs
- Install new HVAC system and duct work
- New electrical wiring
- New plumbing
- New deck in the front of the property
- New insulation
- New drywall instal
- Recorded dates
- Applied: Oct 16, 2025
Intake: Dec 17, 2025
Issued: Dec 17, 2025
Completed: Jun 11, 2026
Status Date: Jun 11, 2026
- Inspection 1
- Inspection Id: 60273
Type: TP - Temp Power Renewal
Result: Cancelled
Status: Insp Cancelled
Inspector: Edward Luft
Request Date: Aug 4, 2026, 12:49:51 PM UTC
Scheduled Date: Nov 2, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno >40k - Elec
Inspection Conducted: No
- Inspection 2
- Inspection Id: 60274
Type: RF - Rough Inspection
Result: Rescheduled
Status: Insp Rescheduled
Inspector: Dean Nieman
Request Date: Mar 5, 2026
Scheduled Date: Mar 16, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno <40k - Elec
Inspection Conducted: No
- Inspection 3
- Inspection Id: 60270
Type: SS - Saw Service
Date: Oct 31, 2025, 2:16 PM UTC
Result: Failed
Status: Insp Cancelled
Inspector: Jose- Torres Hernandez-
Comments: No saw service pole or equipment
Cannot have equipment attached to house and call in as saw service
Saw service is temporary and detached from structure
Request Date: Oct 30, 2025
Scheduled Date: Oct 31, 2025
Inspection Group: RES_ELEC
Inspection Team: Res Reno >40k - Elec
Inspection Conducted: Yes
- Inspection 4
- Inspection Id: 60271
Type: TP - Temp Power
Date: Nov 7, 2025, 3:54 PM UTC
Result: Passed
Status: Insp Completed
Inspector: Shawn Cormier
Comments: Temp power to energize two exterior GFCI receptacles beneath panel only, lockable meter/panel combo on back of house, overhead service, ground rods in place
Request Date: Nov 4, 2025
Scheduled Date: Nov 6, 2025
Inspection Group: RES_ELEC
Inspection Team: Res Reno >40k - Elec
Inspection Conducted: Yes
- Inspection 5
- Inspection Id: 60272
Type: TP - Temp Power Renewal
Date: Feb 5, 2026, 2:56 PM UTC
Result: Passed
Status: Insp Completed
Inspector: Dean Nieman
Comments: Renewed temp power
Request Date: Nov 7, 2025, 3:54:47 PM UTC
Scheduled Date: Feb 5, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno >40k - Elec
Inspection Conducted: Yes
- Inspection 6
- Inspection Id: 60276
Type: RF - Rough Inspection
Date: Feb 24, 2026, 2:04 PM UTC
Result: Failed
Status: Insp Cancelled
Inspector: Dean Nieman
Comments: 1. Feeder to panel rear wall needs to be 1 1/4 from face of stud.
2. Feeder to sub panel needs to be 1 1/4 from fae of stud or protected with metal plates.
Request Date: Feb 20, 2026
Scheduled Date: Feb 23, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno <40k - Elec
Inspection Conducted: Yes
- Inspection 7
- Inspection Id: 60277
Type: RF - Rough Inspection
Date: Mar 10, 2026, 1:31 PM UTC
Result: Inaccessible
Status: Insp Cancelled
Inspector: Dean Nieman
Comments: Inaccessible. Contractor. Lock box number n envelope front door. 4141. Tried putting in the number only, and hitting top eliminating putting on top and then number. 4141. Either attempt unlocked the door.
Request Date: Mar 8, 2026
Scheduled Date: Mar 9, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno <40k - Elec
Inspection Conducted: No
- Inspection 8
- Inspection Id: 60267
Type: RF - Rough Inspection
Date: Mar 11, 2026, 4:10 PM UTC
Result: Passed
Status: Insp Completed
Inspector: Dean Nieman
Comments: Previous defects corrected.
Request Date: Mar 10, 2026
Scheduled Date: Mar 11, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno <40k - Elec
Inspection Conducted: Yes
- Inspection 9
- Inspection Id: 60275
Type: TP - Temp Power Renewal
Date: May 6, 2026, 11:14 AM UTC
Result: Passed
Status: Insp Completed
Inspector: Jose- Torres Hernandez-
Comments: Tp renewal
Same circuits as initial tp inspection
Request Date: Feb 5, 2026, 2:56:21 PM UTC
Scheduled Date: May 6, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno >40k - Elec
Inspection Conducted: Yes
- Inspection 10
- Inspection Id: 60268
Type: FI - Final Inspection
Date: Jun 8, 2026, 12:12 PM UTC
Result: Failed
Status: Insp Cancelled
Inspector: Dean Nieman
Comments: 1. GFIs not working. Laundry , and baths.
2. 25 amp breaker listed on equipment. 30 amp breaker in panel. Exceeds M.O.P.
Request Date: Jun 4, 2026, 5:17:24 PM UTC
Scheduled Date: Jun 8, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno <40k - Elec
Inspection Conducted: Yes
- Inspection 11
- Inspection Id: 60269
Type: FI - Final Inspection
Date: Jun 11, 2026, 1:32 PM UTC
Result: Passed
Status: Insp Completed
Inspector: Dean Nieman
Comments: Previous defects corrected.
Request Date: Jun 9, 2026, 6:19:44 PM UTC
Scheduled Date: Jun 11, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno <40k - Elec
Inspection Conducted: Yes
- Inspection 12
- Inspection Id: 60266
Type: TP - Temp Power Renewal
Date: Aug 4, 2026, 12:49 PM UTC
Result: Passed
Status: Insp Completed
Inspector: Edward Luft
Request Date: May 6, 2026, 11:14:17 AM UTC
Scheduled Date: Aug 4, 2026
Inspection Group: RES_ELEC
Inspection Team: Res Reno >40k - Elec
Inspection Conducted: Yes
- Related record 1
- Permit Number: RES-MEC-25-014567
Url: https://gis.mecklenburgcountync.gov/meck-accela/permit/RES-MEC-25-014567
Relationship: Siblings; Same Parcel
Accela Id: 00000REC250241S
Status: Closed - Complete
Permit Type: Residential
Permit Subtype: Mechanical
Permit Application Submitted Date: Oct 16, 2025
Permit Issued Date: Dec 17, 2025
Total Construction Cost: $10,000
Municipality: CHARLOTTE
- Related record 2
- Permit Number: RES-PLM-25-005219
Url: https://gis.mecklenburgcountync.gov/meck-accela/permit/RES-PLM-25-005219
Relationship: Siblings; Same Parcel
Accela Id: 00000REC250241T
Status: Closed - Complete
Permit Type: Residential
Permit Subtype: Plumbing
Permit Application Submitted Date: Oct 16, 2025
Permit Issued Date: Dec 17, 2025
Total Construction Cost: $12,000
Municipality: CHARLOTTE
- Related record 3
- Permit Number: RES-MEC-26-003637
Url: https://gis.mecklenburgcountync.gov/meck-accela/permit/RES-MEC-26-003637
Relationship: Siblings; Same Parcel
Accela Id: 00000REC2600K85
Status: Resigned
Permit Type: Residential
Permit Subtype: Mechanical
Permit Application Submitted Date: Feb 23, 2026
Permit Issued Date: Feb 23, 2026
Total Construction Cost: $3,500
Municipality: CHARLOTTE
- Related record 4
- Permit Number: BLDG-RESIGN-002279
Url: https://gis.mecklenburgcountync.gov/meck-accela/permit/BLDG-RESIGN-002279
Relationship: Same Parcel
Accela Id: 00000REC2600WGY
Status: Accepted - Permit Resigned
Permit Type: Residential
Permit Subtype: NA
Permit Application Submitted Date: Mar 19, 2026
Municipality: CHARLOTTE
- Related record 5
- Permit Number: RES-ALT-25-002035
Url: https://gis.mecklenburgcountync.gov/meck-accela/permit/RES-ALT-25-002035
Relationship: Same Parcel; Parent
Accela Id: 00000REC250241Q
Status: Building Finaled
Permit Type: Residential
Permit Subtype: Alteration
Permit Application Submitted Date: Oct 16, 2025
Permit Issued Date: Oct 16, 2025
Total Construction Cost: $70,000
Municipality: CHARLOTTE
- GIS Permit Details
- Is Finaled: Y
Permit Fee Type: Construction
Project Name: 2204 Rozelles Ferry Rd - Upfit
Tax Jurisdiction: CHARLOTTE
Usdc Code And Description: 434 - RES DWELLING (ADD, ALTERATION, REPAIR, REPLACE)
Type Of Work: Electrical
Description: - Build several piers
- Rebuild a section of front wall
- Modify some walls
- Framing repairs
- Install new HVAC system and duct work
- New electrical wiring
- New plumbing
- New deck in the front of the property
- New insulation
- New drywall install, etc
-Per contractor petition I'm helping setup the inspection properly:
New service update but will be using under temporary power during the project with two GFCI dedicated circuits next to the existing meter panel combo, we will rewiring up to code the entire house then we will call for rough and final.
Description Of Work: - Build several piers
- Rebuild a section of front wall
- Modify some walls
- Framing repairs
- Install new HVAC system and duct work
- New electrical wiring
- New plumbing
- New deck in the front of the property
- New insulation
- New drywall install, etc
-Per contractor petition I'm helping setup the inspection properly:
New service update but will be using under temporary power during the project with two GFCI dedicated circuits next to the existing meter panel combo, we will rewiring up to code the entire house then we will call for rough and final.
- Public Permit Details
- Permit Requiring Plan Review: No
Co Required: No
Issued By: Admin Admin
Total Construction Cost: $13,000
- Record source
- Mecklenburg Accela